Old directive number: CPL 2-2.58 - Lead in Construction. 29 CFR 1926.62, Interim Final Rule; Enforcement policies and procedures. Also reference OSHA Technical Manual, Section V: Chapter 3 - Controlling Lead Exposures in the Construction Industry: Engineering and Work Practice Controls.
Document Information
Document Number: CPL
02-02-058
Effective Date: